Building Inspections

ROOF & SIDING INSPECTIONS


Permit cards and mid-inspection photos must be onsite before scheduling final roof or siding inspections.  Homeowners scheduling roof or siding inspections should call the contractor for the photos if the photos are not onsite.  Photos by email will not be accepted.  Permit cards will be signed by the inspector.  Due to the volume of inspections, roof and siding inspections are approximately 3 weeks out.

Also, City Code 8-403(10) allows construction work Monday - Saturday between the hours of 7 a.m. and 10 p.m.


All other inspections are approximately one week out - please plan ahead for inspections.  763-767-6476


Thank you for your cooperation.
The Building Inspections Department is committed to providing outstanding service by ensuring commercial buildings and residential homes constructed, altered or maintained in the City of Coon Rapids meet the recognized standard for overall quality of life and building safety through a cooperative effort with our citizens.

How to Schedule

To schedule an inspection, please call Building Inspections at  763-767-6476 between 8:00 a.m. and 4:30 p.m. Monday-Friday.  Inspections are scheduled in 30 minute increments between 7:30 a.m. and 4:30 p.m.   Inspection results are available online.
 
Monetary transactions end at 4:00 p.m. daily
 
To ensure that time is available, please call 48 hours in advance of when the inspection is needed.